City of Bel Aire
2009 Parks and Public Works Projects
Eagle Lake Park
Rip-Rap

Shelter/Grill

New Trees Planted
Denise Park
Refurbished Gazebo
Bel Aire Park

Resurfaced/Striped Tennis Court
City Hall

New Buffalo Grass
Quail Ridge Park
Fountain Rebuilt
More Parks Progress (as of August 21):
- Mulched 96 trees
- Pruned 195 trees
- Used 8,000 gallons of water to hand-water trees
- Sprayed 125 trees with insecticide
- Planted 134 trees
- Removed 7 trees
- Maintained over 600 trees on city property
- Applied 2,500 pounds of fertilizer and 450 gallons of liquid fertilizer to turf and trees
- Applied 300 gallons of pre-emergent to prevent weeds from growing
- Applied 467 gallons of RoundUp
- Applied 342 gallons of weed killer
- Used 110 gallons of insecticide on turf, trees and plants
- Adjusted and maintained 797 irrigation heads on 10 different irrigation systems
- Edged 20,654 feet of curb and 20,092 feet of sidewalk (more than 7 miles)
- Mowed 149 miles of roadside ditches and tributaries
- Finished mowing an estimated 307 acres of grass to date (city parks, City Hall, city pool and Central Park)
- Rough mowed 272 acres with tractor/brush hog
Projects in Progress

Crews replace an outdated water main.

Elk Creek Addition Phase 1: streets and sidewalks are almost complete.

Elk Creek Addition Phase 1: The contractor has sown grass seed and is placing erosion mat to reduce stormwater runoff to the ponds.
Upcoming Projects
Eagle Lake Park Install 6 new park benches on concrete pads Denise Park Rebuild and refurbish existing park sign Bel Aire Park Install new grill Alley Park Improve access to lake Create additional shoreline access areas for fishing Central Park Install park benches and trash receptacles in conjunction with new walking path